Previously, garbage disposal was mainly carried out through sanitary landfilling. The landfill site treated in this way will generate a large amount of landfill gas. If not treated or utilized, it will cause significant air pollution to the surrounding environment and seriously affect the quality of life of nearby residents. Among them, landfill gas power generation is currently the main utilization method. What external conditions are required for biogas power generation in landfills?
1: The landfill must be sanitary, which means that anti-seepage membranes are used during the landfill process

2: The garbage from landfills must be live waste from natural gas generators, and construction waste is not allowed
3: A daily amount of household waste exceeding 500 tons is necessary to generate a large amount of landfill gas. Otherwise, a small amount of gas will affect power generation and investment returns. If the amount of gas is small, it can be considered to use a biogas torch to incinerate these gases.
4: The landfill time should be at least three years, and the design of the landfill site should have a landfill time of at least 10 years.
5: If you want landfill gas power generation to be connected to the grid, you also need to consider whether the nearest connection point is too far from the landfill site. If it is too far, the investment is very high.
This article is provided by gas generator sets for assistance. For more related content, please click: http://www.huannengpower.com I hope this article can be helpful to you. Thank you for reading!