Welcome to Hengtong Electric

Industry News
Home / News & Resources / Industry News / Marker post specifications and marker posts should be known

Marker post specifications and marker posts should be known

Source: Hengtong Electric Published: 2023-10-06 0 views
The marker post mentioned here refers to the marker post above the underground pipeline, also known as the marker post, marker stone, and ground pile.
It mainly serves as a warning sign.
Marker post shape:
The shape of marker posts is generally square, triangular, and circular, with square marker posts being the most common.
Marker post color:
The color of marker posts is generally white or yellow, and there are also other colors, but they are relatively rare.
Marker post height:
The height of marker posts is generally 1 meter, 1.2 meters, 1.4 meters, 1.5 meters, etc. The height can be set according to the usage environment.
Warning signs on marker posts:
Warning signs on marker posts generally state that there is gas, excavation is prohibited, pipelines are prohibited, cables are prohibited, etc. They can be marked according to the situation, and can also include alarm phone numbers, contact phone numbers, company logos, etc.
Cable Marker Post
Characteristics of marker posts:
Dense pile material: High strength fiberglass composite material molded and produced (recycled and useless).
The surface text of the encryption pile product is processed with special silk screen printing and concave processing, and is colored and solidified in one go.
The densified pile has bright color and good anti-aging strength, and its service life can reach more than 30 years.
The encryption pile is truly maintenance free, unlike materials such as cement and stone that require regular annual paint spraying, saving maintenance labor costs. The surface text foundation of the product is hard and durable. It can also be customized one by one based on the information provided by the user unit, such as station number, mileage, path direction indicator arrows, and maintenance phone number.
Installation method for densified piles: Excavate the buried depth pit, cross and insert two 25 cm steel bars in front, back, left, and right directions, and fix them with cement stones. The circular pavement brick adopts a circular hole opener to drill holes through the road surface according to the required size of the pipeline. The lower part is fixed with cement slurry, and the upper mouth is flush with the road surface.
The comprehensive engineering of encrypted piles enhances the new image of standardized management for Party A's units, and the specific dimensions can be customized according to requirements.
The exciting content of this article is provided by the knowledge provided by cable marker posts. There are also many exciting content on this website, and you can click to enter more content: http://webtest2.daoshangbao.cn We have dedicated customer service to answer your questions

Related Products

  • Pultruded Fiberglass Marker Post

    Pultruded Fiberglass Marker Post

  • Roadside Utility Marker Posts

    Roadside Utility Marker Posts

  • Underground Utility Marker Posts

    Underground Utility Marker Posts

  • Underground Cable Marker Posts

    Underground Cable Marker Posts

Scan this code in WeChat