1. The mold for making road crossing stakes and marker posts is made of round steel, divided into left and right halves, and welded with fastening bolts to prevent them from vibrating and affecting their size.
2. The prefabrication of road crossing stakes and marker posts adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, and then the prefabricated reinforcement is placed. Then, layered pouring is used, and the second layer is poured after being compacted with a vibrator. After reaching the solidification strength after pouring, the mold is opened and the surface is wrapped with a film for health preservation.
3. Crossing marker peg, marker post foundation excavation Crossing marker peg, marker post construction tools are highly mobile and fragmented. The foundation is excavated manually, and the bottom is leveled and compacted. 4. Spray luminescent paint strictly according to the color and spacing required in the drawing.
5. According to the characteristics of high fluidity, fragility, and low amount of foundation concrete in the construction of road crossing stakes and marker posts, the concrete is now mixed into dry materials according to the mix ratio, and mixed with water when transported to the site. This can not only avoid segregation problems of concrete during transportation, but also save resources and avoid unnecessary waste.
This article is organized and published by underground marker posts. Do you have any understanding of these contents? For more information, please click on: http://webtest2.daoshangbao.cn We will have more exciting content waiting for you to check out.