Welcome to Hengtong Electric

Company News
Home / News & Resources / Company News / Deep Analysis of Marker post Playing as Warning Marking

Deep Analysis of Marker post Playing as Warning Marking

Source: Hengtong Electric Published: 2022-06-25 0 views
Marker post here refers to the marker post above the underground pipeline, also known as marker post, marker stone, ground pile, etc. It mainly serves as a warning sign. Let's talk about other information.
Shape of marker post: the shape of marker post generally includes square, triangle and circle, of which square marker post is more common.
Color of marker post: the color of marker post is generally white or yellow, and there are other colors, but relatively few.
Height of marker post: the height of marker post is generally 1m, 1.2m, 1.4m, 1.5m, etc., which can be set according to the use environment.
Warning sign of marker post: generally, the warning sign of marker post is written with gas, and excavation is not allowed. There are pipelines below, and excavation is not allowed. It can be marked according to the situation. Company logo, etc
Underground Utility Marker Post
Characteristics of marker post:
1. Marker post material: high strength glass fiber composite material molding (recycling useless).
2. The words on the surface of the marker post product are subject to special silk screen printing and concave treatment, and are colored and cured at one time.
3. The marker post has bright color, anti-aging and good strength, and its service life can reach more than 30 years.
4. The marker post is really maintenance free. Unlike cement, stone and other materials, which need to be painted and sprayed every year, the maintenance cost is saved, and the product surface is hard and durable. It can also be customized one by one according to the station, mileage, path direction arrow, maintenance telephone and other information provided by the user unit.
5. Installation method of marker post: dig a deep pit, cross two 25 cm reinforcing bars at the front, back, left and right, and fix them with cement stone. The round pavement brick shall be perforated on the pavement with a round hole opener according to the required size of the pipe, the lower part shall be fixed with cement slurry, and the upper hole shall be flush with the pavement.
6. The underground all-round project will improve the new image of enterprise standardized management for Party A, and the specific size can be customized according to requirements.
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://webtest2.daoshangbao.cn And consult our staff, will serve you wholeheartedly.

Related Products

  • Pultruded Fiberglass Marker Post

    Pultruded Fiberglass Marker Post

  • Roadside Utility Marker Posts

    Roadside Utility Marker Posts

  • Underground Utility Marker Posts

    Underground Utility Marker Posts

  • Underground Cable Marker Posts

    Underground Cable Marker Posts

Call Us +86 183-6493-6808 Email Us sales1@hengtongep.com