The gas marker post is a new product made of resin as the matrix and glass fiber as the skeleton. In recent years, it has been very popular in our domestic market. Some products made of this material have played an important role in many fields. Let's talk about the application and installation of gas marker posts.
This product not only has a very smooth appearance and is easy to transport and install during use, but also can be directly buried in the soil. For some unstable factors in the soil, it has a good anti-corrosion effect. Moreover, their own colors and some words set up have very obvious warning effects, which can attract the attention of passers-by or construction personnel in a short time and ensure the safety of the use environment.
Laying specification for gas marker post of water supply pipeline: preparation → excavation → backfilling → burying marker post → horizontal laying → vertical laying → burying test of marker post. Buried depth requirements: the marker post shall be kept level with the ground when walking. The lawn is 5 cm higher than the ground. The traffic marker post and plate of the straight section of the cable channel shall be embedded with one marker post every 15 meters. When burying, one marker post shall be buried at each corner according to the corresponding symbol. A corresponding identification pile shall also be installed at some places requiring special attention of the project.

Location of gas marker post:
1. The gas marker post of the water supply pipeline shall be installed directly above the pipeline. When the marker post is used as the corner pile, it shall be installed directly above the midpoint of the corner section. When there is no installation condition directly above the pipeline, it can be set in the green belt near the road, and the appropriate purpose of the pipe pile shall be marked on the marker post.
2. Marker posts shall not be set on the closed roads. The distance between marker posts should be 100m. If the ground is flat, there are few visual obstacles and the pipeline is straight, the distance between marker posts can be 100m. In special sections, specific laying standards and guidelines shall be followed for laying of pipe marker posts!
Marker posts are mainly plastic steel, gas and composite raw materials buried along the high-pressure natural gas pipeline and painted with yellow symbols. In order to prompt the warning effect, they are marked with "gas pipeline, gas telephone, pipeline stake number, pipeline direction and electronic Patrol information button", which is convenient for the line patrol and emergency repair personnel to quickly find the pipeline position and win the emergency repair opportunity.
That's all about the application and installation of gas marker posts. If you have any questions about this, please come to our website http://webtest2.daoshangbao.cn Consult and understand.